Auld & White completed the new construction of a 400,000 sf cross-dock distribution warehouse, designed by O’Brien & Associates, with (60) 9’ wide by 10’ high sectional metal overhead doors for truck loading and unloading docks.  The building is fully sprinkled with specialty ESFR heads for high bay storage racking systems. The project included a 95,000 gallon fire protection water tank to support sprinkler system. The building’s structure utilized a pre-engineered metal building with bar joists to support roof and concrete tilt wall panels for the buildings perimeter. Standing seam metal roof with an underlayment of vinyl-faced insulation capped the building completing the shell.